45B7DF64-103B-08A7B4.doc Flow Control CLEANING / REPLACEMENT Procedure Step #1 Please remove the Brew Express from the wall by removal of 4 out
45B7DF64-103B-08A7B4.doc Step #2 Place Brew Express face down on a towel to protect front face
45B7DF64-103B-08A7B4.doc Step #3 Loosen lower valve connection nut with 18 mm or equivalent wrench. Step 4 Carefull
45B7DF64-103B-08A7B4.doc Step 5 Remove flow control with 18 mm or equivalent wrench
45B7DF64-103B-08A7B4.doc Step 6 To Clean for low volume (Flow) Problem : Rinse under strong stream of water to clean or and use small paper
45B7DF64-103B-08A7B4.doc Step 7 Place Cleaned or Replacement flow control back into valve. Seal O-Ring on flow control should be upward
45B7DF64-103B-08A7B4.doc Tighten with wrench snug to valve. Step 8 Re-Align copper line with flow control by rotating. Ensure
45B7DF64-103B-08A7B4.doc Tighten copper line connection. Do not over tighten. Step 9 Re-Install Brew Express into wall, “Sna
45B7DF64-103B-08A7B4.doc
Comments to this Manuals